Bon Secour Hospital

G&J Engineering limited were awarded the project:  Medical assessment unit refurbishment The scope of works of this project included the removal of redundant equipment. This project included the installation of radiant panels, sanitaryware, ventilation and alteration to HWS/CWS/ HWSR distribution pipework. Engineer: Homan O’Brien  

Holy Family parish church

G&J Engineering limited were awarded the project:  Holy Family parish church, Dun Laoghaire This project included the installation of a new heating system, replacing an existing system of one pipe radiators and modifications to the plantroom pipework. This project continues G&J engineering’s long and proud tradition of installations in houses of worship, with over 30 […]

UCD CRID building

G&J Engineering limited were awarded the project:  UCD CRID building  The scope of works of this project included the removal of redundant equipment. This project included the installation of radiators, sanitaryware, ventilation, autoclave, compressed air and alterations to the HWS/CWS/HWSR distribution pipework. Engineer: CRA

UCD Nova Lab

G&J Engineering limited were awarded the project:  UCD Nova labs 1 & 2           The scope of works of this project included the removal of redundant equipment. This project includes the Installation of vulcathene chemical waste pipework, emergency eye wash & shower and alterations to the HWS/CWS/MWS/HWSR distribution pipework.

Bon Secour Hospital

G&J Engineering limited were awarded the project:  Energy centre refurbishment This project presented a number of challenging aspects, which included a seamless changeover of the existing system to the new plantroom equipment. Throughout the project services could not be interrupted. The scope of works of this project included the removal of over 25 tonnes of […]

MS care home

G&J Engineering limited were awarded the project: Refurbishment of bathrooms & bedrooms This project includes the Installation of Sanitaryware, Tiling, LST Radiators, alterations to LPHW distribution pipework, alteration to HWS/CWS distribution pipework, MWS Break tank, booster pump, Painting & Decorating.

UCD Innovation lounge

G&J Engineering limited were awarded the project: UCD Innovation lounge science building The scope of works of this project includes Removal of redundant equipment, This project includes the Installation of Fan coil units, Ventilation, alterations to LPHW & CHW distribution pipework, alteration to HWS/CWS/MWS/HWSR distribution pipework, Controls, Insulation, Balancing & commissioning Engineer: CRA

Holy Trinity Church

G&J Engineering limited were awarded the project: Plantroom refurbishment The scope of works of this project includes Removal of redundant equipment including existing cast iron sectional boiler, This project includes the Installation of 2no. A rated stainless steel heat exchanger boilers, Cascade, air dirt separator, pressurisation unit, circulating pumps, alterations to LPHW distribution pipework, Gas […]

St Paul’s College

G&J Engineering limited were awarded the project Boiler replacement The scope of works included replacing existing Cast iron sectional boiler, alterations to LPHW distribution pipework, installation of 4no. 150KW stainless steel heat exchanger boilers, Gas pipework alterations, Air dirt separator, Boss X pot, Circulating pumps, Insulation, labelling, Inhibitor Dosing of system, testing & Commissioning. This […]

UCD Yoga

G&J Engineering limited were awarded the project UCD Yoga The scope of works included alterations to LPHW distribution pipework, installation of Radiators, HWS/CWS distribution pipework, Sanitaryware, Ventilation supply & Extract, Insulation, labelling, testing & Commissioning. This project was completed within the specified timeframe with minimal disruption to the building services. Engineer: Ethos engineering